Hotline:+86-0755-23300032
5G Booster Pilot Site

Site Location: 14th Floor  of Guangzhou Global Communication Building

Main Unit Install Picture:

5G Booster Install Picture:

5G Booster Working Performance:

In the weak wells of the 14th floor of the Global Communication Building, the original distribution system can be effectively used, and vertical and horizontal planes are not required to be modified.

Only a simple modification at the combiner position can achieve a single feeder dual current coverage effect.

The downstream rate is about 350Mbps.

With the addition of this product, the dual-stream downstream rate is above 600Mbps, an increase of 71%.

Signalwing Corporation
Address:Building C4, Zone C, Fuhai International Science and Technology Park, Zhancheng Community, Fuhai Street, Baoan District, Shenzhen 518103
FAX:+86-0755-23304995